// Case Studies

In production.
On real projects.

Indxdb didn't launch as a product until it had been used on real mining capital programmes for years. These are the kinds of problems we solve, and the kinds of outcomes our clients see.

!
A note on names. The case studies below are composite scenarios drawn from real Mventech delivery work. We're working through formal client approvals before publishing named studies — when those are released, they'll appear here. In the meantime, we're happy to share named references on request as part of an active conversation.
BEFORE AFTER ~14 days <1 day
Tier 1 Mining CAPEX Reporting Composite scenario

From two-week reporting cycle to live executive dashboard

A Tier 1 precious metals producer running an 18-project CAPEX portfolio was spending 10–14 days a month producing the executive board pack — and the numbers were always lagging. Indxdb replaced that workflow with a live Portal, surfaced through the client's brand and domain.

14d → 1d
Reporting cycle
3
FTE freed up
18
Projects unified

"We used to debate whose number was right. Now we debate what to do about the number. Different conversation."

— PMO Lead, precious metals producer
M0 M12 M24 original plan indxdb model ~15% headcount over-estimation
Base Metals Resource Modelling Composite scenario

Catching a 15% headcount over-estimation before approval

A copper development project in the feasibility-to-FID phase had a resource plan that, on its face, looked reasonable. The Resource Modeller benchmarked it against four comparable projects in the Indxdb library — and surfaced a meaningful overstatement in mid-cycle senior engineering headcount.

15%
Headcount reduction
~$12M
2-yr labour saving
2 wks
From input to FID-ready

"The model didn't tell us we were wrong. It showed us a comparable that was right, and let us draw our own conclusion."

— Project Director, base metals development
CLIENT A CLIENT B CLIENT C EPC master view cross-client portfolio ONE PLATFORM · THREE BRANDS
EPC Firm Multi-tenant Composite scenario

An EPC firm running three mining clients from one Indxdb licence

A mid-tier EPC firm was rebuilding the same Power BI scaffolding for every new client engagement — burning four to six weeks of delivery time before the first useful report. Indxdb gave them a single Enterprise tenant where each client gets their own white-labelled portal, their own branding, their own data isolation.

3 wks → 0
BI ramp-up per client
3
Concurrent client portals
1
Unified internal view

"Now reporting is something we sell, not something we apologise for at month-end."

— Engineering Director, mining EPC
// Coming soon

Named case studies arriving through 2026.

We're working through formal sign-offs with current Indxdb clients. Real names, real numbers, real outcomes — landing here soon.

Talk to us in the meantime

Curious whether your portfolio fits the pattern?

Tell us about your projects — scale, phase, reporting pain — and we'll show you the closest case match in our delivery experience. 30 minutes, honest assessment.